Fusion roof anchor post can accommodate most industrial roof designs including standing seam membrane built up metal sheathing concrete and wood.
Post to membrane roof connector.
D bolt forged anchorage connector 420 lb weight capacity attaches to concrete wood.
Gutters of timber plywood or reinforced concrete may be faced inside with thermal insu lation boards selected and fixed according to the local standards in force.
It is essential to place 2x12 blocking on the flat between the sleepers at post locations so the lags will have something solid to bite into.
Adjustable sleeve can be any desired height.
Currently the support posts for the railing system are going down thru a flat rubber roof and are attached to the ceiling framing of the sunroom below.
Round post with slip on caps.
Slip on caps are 100 stainless steel.
The screws or lags should be as long as possible without protruding from the bottom of the sleepers and putting holes in the roof membrane.
With the bright white reflective attributes of tpo there is money to be saved on energy usage during the warmest months of the year.
Client has a tiled outside deck over a living area it doesn t leak.
Hello everyone looking for some advice on our clients second story deck above a sunroom with flat roof above.
Built up roof membrane 1 cdx plywood corrugated metal and concrete roof decks 1 concrete 2.
Post is 2 5 round high strength steel.
Roof deck railing post flashing my problem is a little different.
Attaches to the surface of existing roof structures quick easy installation reduces cost requiring minimal labor and eliminating the need for roof penetration and repair.
Roof anchor 1 roof post 1 truss boss anchor 1 view all.
10 years ago copper flashing torched membrane with two staircases.
Minimal section this depends on the surface of the roof being arranged the pitch of the gut ter and the nature of the constituent materials.
Single ply membrane roofing has become one of the top roofing materials for most commercial facilities.
There are savings to be had in its cost effectiveness for businesses almost anywhere.
A typical 100 square roof with two layers of polyiso insulation can be mechanically attached and the roof fully closed up in five days with an optimum crew.
Find post connector deck connectors at lowe s today.