Install the roofing screws vertically along each rib in the panel.
Plywood roof installation.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Most roofs will be sheathed in plywood at least 3 8 inch thick.
The nailing pattern that is used is also very critical.
In order to achieve the best results when installing plywood products it is very important to use the proper size nail.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
Not all plywood applications require the same size nail or spacing between nails.
Place the first screw.
Installing the plywood sheets.
Check the nailing surface is level step 2.
Generally 12 15mm ply is the most commonly used thickness.
Properly fasten panels including fastening and spacing hints step 4.
And scroll down to see more details on each with installation hints and tips below.
We go in depth on how to install roof sheathing.
That will suffice on a roof with rafters set 16 inches apart with minimal roof loads.
The connection between the roof sheathing and the structure is a vulnerable point that is known to fail during a hurricane.
Cover sheathing with.
During a hurricane the strength of the sheathing on the roof can greatly impact the homes ability to weather the storm.
Ventilate the roof according to current building codes step 3.
How to correctly install plywood or osb roof sheathing.
Starting with how to place the first row of sheathing we cover fastening methods the use of h clips stagg.
Installing plywood on a roof hello youtubers here s another video about plywood sheathing and composition shingles after replacing all damaged wood and.
Keep these tips in mind when roofing in hurricane areas.
The plywood is nailed at roughly 150 mm spacings ensuring the ends finish on the centre line of a truss.